PetroworkSOLUTIONS · ANGOLA
28 APRIL 2026 · FACILITIES

Viana workshop adds a dedicated XYLAN coating line

Viana workshop adds a dedicated XYLAN coating line

Additional capacity inside the 4,550 m² covered warehouse at Polo Industrial de Viana.

Additional capacity inside the 4,550 m² covered warehouse at Polo Industrial de Viana.